Politics · via GBC Ghana Online

President Mahama commissions evacuation of waste heaps from Agbogbloshie to Adepa Engineered Landfill Site

Reported by GBC Ghana Online·
President Mahama commissions evacuation of waste heaps from Agbogbloshie to Adepa Engineered Landfill Site

President John Dramani Mahama has commissioned the evacuation of waste heaps from Agbogbloshie in Accra to the Adepa Engineered Landfill Site near Nsawam in the...

Read the full story on GBC Ghana Online ↗

This story was published by GBC Ghana Online (gbcghanaonline.com). 233NOW shows the headline and a short excerpt and links to the original.

Full coverage: 4 outlets reported this

Agbogbloshie waste evacuation to take 90 days as one million tonnes of waste are being transferred – Mahama

See how every outlet covered it →

More Politics news