Full coverage · Politics

Agbogbloshie waste evacuation to take 90 days as one million tonnes of waste are being transferred – Mahama: how 4 outlets covered it

First reported · Last update 19 Sept 2026, 02:13 GMT
Agbogbloshie waste evacuation to take 90 days as one million tonnes of waste are being transferred – Mahama
4outlets covered it
9reports in total
3Newsreported first · coverage over 19h
3NewsMyJoyOnlineGBC Ghana OnlineStarr FM

Every report, in the order it was published

  1. 3NewsReported first

    President John Dramani Mahama is expected to on Friday, September 18, 2026, commission an exercise to evacuate waste from Agbogbloshie in Accra to the Adepa Lan...

  2. 3News

    President John Dramani Mahama has commissioned the evacuation of waste heaps from Agbogbloshie in Accra to the Adepa Engineered Landfill Site near Nsawam in the...

  3. MyJoyOnline

    The evacuation of waste from the Agbogbloshie landfill to the Adepa Waste Centre at Nsawam is expected to take 90 days, with approximately one million tonnes of...

  4. MyJoyOnline

    The evacuation of waste from the Agbogbloshie landfill to the Adepa Waste Centre at Nsawam is expected to take 90 days, with approximately one million tonnes of...

  5. GBC Ghana Online

    President John Dramani Mahama has commissioned the evacuation of waste heaps from Agbogbloshie in Accra to the Adepa Engineered Landfill Site near Nsawam in the...

  6. MyJoyOnline

    President John Dramani Mahama has commissioned the evacuation of accumulated waste from Agbogbloshie in Accra to the Adepa Engineered Landfill Site near Nsawam ...

  7. MyJoyOnline

    President John Mahama says the land being reclaimed through the evacuation of waste from Agbogloshie will be transformed into an Industrial Park.

  8. Starr FM
  9. Starr FM

233NOW groups reports automatically when their headlines describe the same event. Each headline and excerpt belongs to its outlet — follow the links to read the full reports.